How MARS increased a failing stone bridge’s weight from 7 to 40 tonnes without rebuilding it
Unsliven Old Bridge, Stocksbridge was restricted to 7 tonnes after cable damage weakened its stone arch. Stress Bridge Division Goldhawk used the MARS System to strengthened it to 40 tonnes, a low-carbon alternative to demolition and rebuild for Sheffield County Council with Amey LG.