Goldhawk

Structural repair masonry arch structure and bridleway

Masonry loss shown on the bridge prior to restoration
Masonry loss shown on the bridge prior to restoration

Hempyard Bridge is a three span historic masonry arch structure carrying a Public Right of Way (Bridleway) over the Black Bourn River just to the West of Ixworth. The central span is 4m, with 1.4m span side spans. The bridge has a clear width between parapets of 4.2m at the middle of the bridge and increases towards the banks due to the plan splay of the bridge.

The challenge

The bridge has been previously described as being in very poor condition, and in June 2016 a temporary timber walkway was installed as an interim measure to relieve loading effects on the structure, and to enable the bridge to remain open for pedestrian and equestrian use pending major refurbishment/strengthening or reconstruction.

Specialist teams

The bridge has listed Grade I status within the curtilage of the adjacent Grade 1 Listed Abbey. Our team were required to provide conservation advice in respect of the suggested repair programme. The project necessitated close liaison with the local authority conservation officer. We used our in-house trained heritage craftsmen in combination with our bridge strengthening technicians to deliver a high quality repair to the structure.

Assessment and planning

A detailed report had been prepared for the client by Kier Group PLC which gave details of the damage and a scope of repairs works to be completed. The team at Goldhawk liaised directly with the Environment Agency for works over and in the Black Bourne Brook. We provided detailed method statements to satisfy the local conservation officer.

Delivering the solution

Our experienced team carefully selected heritage lime mortars together with a matching brick type. It was essential that our solutions were low impact and left only a light footprint.

Large crack as the wing wall bulges

Sizable cracks throughout

Large cracks were found throughout the arches and various joints plus damage to render.

Collapse of the masonry, heavily spalled brickwork

Damage to brickwork

The structure showed scour under the foundation and heavily spalled brickwork.

Cracks and collapse throughout the arches on the historic building

Poor condition

Roots and foliage were embedded in the brickwork contributing to extensive damage and collapse.

Structural repair and strengthening of this listed masonry bridge

Major refurbishment

Our team provided specialist conservation advice and liaised closely with the local authority conservation officer whilst carrying out the repair.

Three span historic bridge after repair and strengthening is complete

Low impact and light footprint

Carefully selected heritage lime mortars and matching brick types.