• Home
  • LinkedIn
  • Email
  • Our expertise
  • Partners
  • Goldhawk services
  • Structural waterproofing
  • Flood proofing
  • Case Studies
  • Strengthening systems
  • MARS System
  • PARS System
  • Contact
  • Home
  • LinkedIn
  • Email
Goldhawk
  • Our expertise
  • Partners
  • Goldhawk services
  • Structural waterproofing
  • Flood proofing
  • Case Studies
  • Strengthening systems
  • MARS System
  • PARS System
  • Contact
  • About us
  • Goldhawk services
  • Structural waterproofing
  • Flood proofing
  • MARS System
  • PARS System

What weight limit did Unsliven Old Bridge have before strengthening?

A

What weight limit did Unsliven Old Bridge have before strengthening?

The bridge was restricted to 7 tonnes following a local authority structural assessment. STRESS Bridge Division used the MARS System to bring the bridge up to full 40-tonne highway capacity.

Recent articles

  • Announcement: strengthening the bond
  • A treatise on strengthening methods for masonry bridges
  • Celebrating 25 years
  • Alternative to bridge infilling

Discover how we can help with your arch, bridge, tunnel or parapet project

Get in touch today

Contact

Telephone: 01753 516755

goldhawk@stressuk.com

Address

STRESS Bridge Division

CanBuild House, Bristol Way
Slough, SL1 3QE
United Kingdom

Information

Registered company information

Privacy policy

© 2026 Stress UK

Design by Spyre Limited

Navigation

  • About us
  • Goldhawk services
  • Structural waterproofing
  • Flood proofing
  • MARS System
  • PARS System
  • Case Studies
  • Partners
  • Contact
  • Articles
  • Site Map