Archives: FAQs
How did the STRESS team access the underside of the arch above the river?
A pontoon was crane-lowered from road level into the Little Don River and assembled on site with a scaffolding staircase built for safe access. Scaffolding towers were erected on the pontoon to reach the arch at height.